IDPW Mica Supervisory Area Office HVAC System Replacement

Coeur d’ Alene, ID

The Idaho Department of Lands’ Mica Supervisory Area Office is an approximately 26,540 SF occupied administrative facility made up of two connected wings: the original 1998 wing, approximately 13,726 SF, served by a VAV mechanical system, and the 2019 addition wing, approximately 12,814 SF, served by a VRF mechanical system. This project primarily focused on the 2019 addition wing, where the existing VRF system has experienced ongoing performance and reliability issues. The project need is to provide a dependable, maintainable, and energy-conscious HVAC solution that improves occupant comfort while allowing the facility to remain operational during construction. Walker Construction is serving as the Design-Builder for the project, leading the design and construction effort with Architects West, MSI Engineers, Apollo Mechanical, and TESTCOMM. The current design replaces the failing VRF system serving the 2019 addition with a new hydronic HVAC system, including new fan coil units, boilers, chiller, pumps, piping, controls integration, electrical support, TAB, commissioning, and owner training. The scope also includes system investigation, construction documents, permitting, procurement, phased installation in an occupied building, and closeout to deliver a fully functional HVAC system for IDL’s long-term use.

Client: Idaho Department of Public Works
Design-Build Partners: MSI Engineers & Architects West