Rockwood at Whitworth – Palvella Glen

Spokane, WA

Walker Construction was excited to partner with Rockwood Retirement Communities on the complex, two-phase Rockwood at Whitworth campus redevelopment. In Phase I, Palvella Glen, we relocated utilities, critical functions, and residents from the east side to the west side of the facility, allowing us to demolish the old structure and construct a new 76,000 SF, three-story building with a basement, housing assisted living and memory care units. Notable amenities include a comprehensive commercial kitchen catering to the entire facility, a sensory room, bathing facilities, a hair salon, a 200-gallon fish tank, and employee training and breakrooms. The basement accommodates mechanical and electrical rooms for the entire facility, along with a commercial laundry area. Walker Construction stayed on site to assist the Rockwood team with the final State inspections, trainings, and occupancy transitions before focusing on Phase II, The Northland, which adds 117 independent living units to the campus.

Client: Rockwood
Architect: NAC Architecture