
Spokane Felts Field Terminal Renovation & Café Remodel
Spokane, WA
Walker Construction is completing Phase 3 of the Skyway Café repair and restoration work at Spokane Felts Field, following the fire that damaged the café space. Skyway Café has long been a recognizable part of the Felts Field terminal experience, and this project supports the effort to bring the space back into service while preserving its role within the historic airport terminal. Walker’s Phase 3 scope focuses on the full infrastructure repair package, including selective demolition, exterior and interior door and window work, framing, gypsum board, stucco patching, flooring preparation, painting, and major building system upgrades. The work also includes new mechanical, electrical, plumbing, low-voltage, and fire alarm infrastructure needed to support the future café operation. In addition to the café restoration, the project includes a finish refresh of the terminal side of the facility, including new primer and paint, professional cleaning, and related finish improvements. This phase prepares the space for Phase 4, which will include the tenant’s final finishes, kitchen equipment, and café-specific buildout. The project highlights Walker’s ability to manage complex public works renovations in occupied, operational facilities while coordinating multiple trades, existing conditions, airport operations, and future tenant requirements.
Client: Spokane International Airport
Architect: MWA Architects